DISTRICT NEWS.
KEREPEEHI. ROADING. The road across the Kerepeehi block has now been formed for its entire length, and about three-quarters of a mile has been metalled. A bridge across the Awaiti canal will be erected next year by the Lands Department. A punt will probably be placed near the Ngarua- wharf for a ferry. THE NEW DREDGE*Thu erection of the new American steam dipper dredge at Kerepeehi is practically completed. Several parts will not be fitted until the machine is ready to commence work, as their enormous size would hinder the .transportation of the dredge. It i.s not knbwn where the dredge will commence working, but it is thought that it will be in the Ngarua-Awaiti canal. rhe pontoon for the second dredge of this type Is now receiving the finishing touches, and the machinery is being, disassembled ready /or re-erec-tion after the holidays.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/HPGAZ19231219.2.2
Bibliographic details
Ngā taipitopito pukapuka
Hauraki Plains Gazette, Volume XXXIV, Issue 4640, 19 December 1923, Page 1
Word count
Tapeke kupu
145DISTRICT NEWS. Hauraki Plains Gazette, Volume XXXIV, Issue 4640, 19 December 1923, Page 1
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Hauraki Plains Gazette. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.