£1,600,000 TUNNEL.
THROUGH C ASCADE MOUNTAINS. A tunnel, seven and tliree-quarter miles lout;, and penetrating the Cascade Mountains, deserihed as one ot the greatest construction projects, m the history of railways, has been started. according to Mr Ralph Rudd, president of the Great Northern Railroad, quoted in a Reuter Chicago message. The cost will be 8,000.000 dollars (about 11,000.000). The tunnel will reach from Scenio, on the west, to Rums, on the east, and electrification of the lines will cost an additional 2.000.000 dollars (about £400,000). The tunnel will shorten the line by 18 miles and will lower the summit by 1000 feet. It will save one hour’s running time, and is expected to be completed before the end of 1028.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/HOG19260420.2.36
Bibliographic details
Ngā taipitopito pukapuka
Hokitika Guardian, 20 April 1926, Page 3
Word count
Tapeke kupu
121£1,600,000 TUNNEL. Hokitika Guardian, 20 April 1926, Page 3
Using this item
Te whakamahi i tēnei tūemi
The Greymouth Evening Star Co Ltd is the copyright owner for the Hokitika Guardian. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of the Greymouth Evening Star Co Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.