GREAT SOUTH ROAD.
PAPAKURA’S PORTION. WORK NEARING COMPLETION. It was reported at Monday night’s meeting of the Papakura Town Board that the work in connection with the reconstruction of Papakura’s portion of the Great South Road was nearing completion. Metalling: had been commenced and up to Monday night three chains had been done. Provided the weather holds good for about a fortnight it is anticipated that the road will be completed by then.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/FRTIM19210506.2.3
Bibliographic details
Franklin Times, Volume 9, Issue 630, 6 May 1921, Page 2
Word Count
73GREAT SOUTH ROAD. Franklin Times, Volume 9, Issue 630, 6 May 1921, Page 2
Using This Item
Stuff Ltd is the copyright owner for the Franklin Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.