THETIS SALVAGE WORK
ADJUSTMENTS ON THE ZELO
(Received July 27, 9 a.m.)
LONDON, July 26.
The Liverpool and Glasgow Salvage Association reports that the salvage ship Zelo has returned to Birkenhead. It added:
"We cannot guarantee in future salvage operations on the Thetis that there will not be a recurrence of the concentrated load upon two baulks, and in view of that uncertainty it becomes necessary to provide baulks throughout the Zelo which will take the concentrated load. This load cannot be assumed to come under given baulks in any order. This m^ans that there will recruire to be a substantial margin of safety in each baulk, and necessary adjustments will now be made on the Zelo."
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19390727.2.74
Bibliographic details
Evening Post, Volume CXXVIII, Issue 23, 27 July 1939, Page 9
Word Count
117THETIS SALVAGE WORK Evening Post, Volume CXXVIII, Issue 23, 27 July 1939, Page 9
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.