OKARITO DREDGING RETURN.
(By Telegraph.) ' r (Special, to "The Evening Post.") 1 ■ - DUNEDIN, February 13. For four weeks from January 1 to January 25 the Okarito Five-mile Dredging Company reports that the total gold won was 181oz lOdwt, the total time worked was'37l hours, and the total non-working time was 69 -hours. (Dredging was resumed after the holidays on Friday, January 6.) The total yardage treated^ was 23,500, an average of 63' cubic yards per hour. The average- value of the ground (on the basis of gold being worth £4 per ounce) was 7%d per cubic yard.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19330214.2.128.2
Bibliographic details
Evening Post, Volume CXV, Issue 37, 14 February 1933, Page 10
Word Count
97OKARITO DREDGING RETURN. Evening Post, Volume CXV, Issue 37, 14 February 1933, Page 10
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.