QUEENSLAND FLOODS
I • (Received 9th February, - 2 p.m;) . / BRISBANE, This Day. [Tram traffic, over thi Tully River j has been resumed despite 'the fact that the flood waters are a foot-over the railway bridge.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19330209.2.82.13
Bibliographic details
Evening Post, Volume CXV, Issue 33, 9 February 1933, Page 12
Word Count
34QUEENSLAND FLOODS Evening Post, Volume CXV, Issue 33, 9 February 1933, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.