TRAINS DELAYED
Railway Lights Fail (By Telegraph.—Press Assn.—Copyright.) AUCKLAND, November 3. Delays of 10 minutes to the Limited express for Wellington and 25 minutes to the New Plymouth express were caused by a fire tonight, iu a transformer box at Westfield, from where the railway has a direct' feed for the track lighting and signalling system on the section between Auckland and Paerata. Au express goods trains for Wellington also was delayed.
The whole of the Auckland marshalling yards were affected till the auxiliary supply was switched on. The Limited express had just begun to move when the signal light at the end of the platform went out and the driver stopped the train after it had moved only about five yards.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/DOM19421104.2.77
Bibliographic details
Ngā taipitopito pukapuka
Dominion, Volume 36, Issue 34, 4 November 1942, Page 8
Word count
Tapeke kupu
122TRAINS DELAYED Dominion, Volume 36, Issue 34, 4 November 1942, Page 8
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.