THE CHANNEL TUNNEL
FIVE-YEAR, CONTRACT TO COST TWENTY MILLIONS. 1 London, March 11. The Channel Tunnel scheme under consideration provides for two tubes thirty miles long, costing .-£20,000,000. The construction would occupy fivd years. The commission in Paris is also considering tunnels at Constantinople and Gibraltar, "iving direct communication to Europe, Asia, and Africa. Tie commissjon has nlready agreed on the advisability ot tue schemes. —Aus.-N.Z. Cable Assn.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/DOM19190313.2.43
Bibliographic details
Ngā taipitopito pukapuka
Dominion, Volume 12, Issue 144, 13 March 1919, Page 5
Word count
Tapeke kupu
68THE CHANNEL TUNNEL Dominion, Volume 12, Issue 144, 13 March 1919, Page 5
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.