THE BASIN RESERVE
THE BIKROVEMENTS. The Keserves Committee reported to tha City Council last evening that they had. received a report from the City Engineer! in connection with improvements at the Basin Itescrve, in which he recommended fencing extension and other works. The. estimated total expenditure required to. complete the fencing on the north side, erect new tool shed, construct entrance, completion of caps and concrete columns, and general repairs to paths was i'Sli'iH Tho completion of the fencing on tha south side would be ,£SO, or a total of .£615
Tho City Engineer also suggested for favourable consideration tho erection of a public stand.
The engineer's recommendations wero adopted.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/DOM19170615.2.26
Bibliographic details
Ngā taipitopito pukapuka
Dominion, Volume 10, Issue 3111, 15 June 1917, Page 4
Word count
Tapeke kupu
110THE BASIN RESERVE Dominion, Volume 10, Issue 3111, 15 June 1917, Page 4
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.