MAIN TRUNK TRAINS RUNNING
LOOP LINE COMPLETED. By Telegraph—Press Association. ' Auckland, December 25. As _a result' of tho construction of a loop line,-the gap in the Main Trunk line has been closed, and there is now no necessity for passengers to translor irom one tram to another. Tho work, of dealing the Karaka cutting, where the slip occurred, will probably otttupy some weeks, but the time-table will be adhered to by means of the loop line. '
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/DOM19161226.2.28
Bibliographic details
Ngā taipitopito pukapuka
Dominion, Volume 10, Issue 2960, 26 December 1916, Page 6
Word count
Tapeke kupu
76MAIN TRUNK TRAINS RUNNING Dominion, Volume 10, Issue 2960, 26 December 1916, Page 6
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.