DAMAGE AT KAITAWA POWER WORKS REPAIRED
yy GISBORNE, May 15. "The damage was slight ahd superficial, and has already been repaired," said Mr. F. W. Lindup, acting disfrict engineer at Napier, after visiting the Kaitawa hydroslectric. works, where he inspected uhe lake end of the tunnel. "There never was any question ~jt the tunnel system being seri.ously affected or the production, M power from ihe Kaitawa ;cheme delaye.d as a result of the' blasting recently undertaken, at vhe lake end." — ; -
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHRONL19470515.2.27
Bibliographic details
Chronicle (Levin), 15 May 1947, Page 5
Word Count
80DAMAGE AT KAITAWA POWER WORKS REPAIRED Chronicle (Levin), 15 May 1947, Page 5
Using This Item
NZME is the copyright owner for the Chronicle (Levin). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.