REST ROOMS HOLD-UP
MATERIAL NOT AVAILABLE When renewed application was made to the District Building Controller, Palmerston North, by the building contractors of the Shannon rest rooms for permission to proceed with the erection of the building, the building controller stated that this proposal was recognised as being very desirable, but it would be appreciated that the material supply position had rapidly deteriorated since the previous application. Under these circumstances, while so many builders were held up for building materials, it was only reasonable to defer such work in favour of home building. The controller concluded by expressing regret that he could not grant approval at present.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHRONL19461003.2.9.2
Bibliographic details
Chronicle (Levin), 3 October 1946, Page 3
Word Count
107REST ROOMS HOLD-UP Chronicle (Levin), 3 October 1946, Page 3
Using This Item
NZME is the copyright owner for the Chronicle (Levin). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.