THE NEW TEACHING BLOCK AT LINCOLN COLLEGE under construction. It is to be known as the Hilgendorf Wing after Dr. F. W. Hilgendorf, a distinguished former member of the staff, and is costing about £750,000. Its area is 100,000sq. ft. The erection of this building is up to schedule and is expected to be completed by July next year. It will house four groups of college departments. In the next few years it is likely that buildings worth about £2m will be erected at Lincoln College.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/CHP19660720.2.13
Bibliographic details
Ngā taipitopito pukapuka
Press, Volume CVI, Issue 31116, 20 July 1966, Page 1
Word count
Tapeke kupu
86THE NEW TEACHING BLOCK AT LINCOLN COLLEGE under construction. It is to be known as the Hilgendorf Wing after Dr. F. W. Hilgendorf, a distinguished former member of the staff, and is costing about £750,000. Its area is 100,000sq. ft. The erection of this building is up to schedule and is expected to be completed by July next year. It will house four groups of college departments. In the next few years it is likely that buildings worth about £2m will be erected at Lincoln College. Press, Volume CVI, Issue 31116, 20 July 1966, Page 1
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
Ngā mihi
This newspaper was digitised in partnership with Christchurch City Libraries.