HIGHWAY TO TUNNEL
Roads Board Sees Project Members of the National Roads Board yesterday sawwork on the approach to the Christchurch-Lyttelton road tunnel for which the board has assumed responsibility, and had the proposals explained to them. The board's section of th* construction is about two miles and a half from Ferryroad to the Road Tunnel Authority’s boundary, which is about 15 chains from the Heathcote portal. The roadway has been designed to motorway standards, with a formation width of 45ft As well as the actual roadway, there will be a bridge over the Heathcote river, an overbridge at the railway, a two-lane underpass at Port Hills road and Horotane Valley road, and a aingle-lane underpass at the Lyttelton Borough Council's reservoir on the hill above the road.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/CHP19610503.2.235
Bibliographic details
Ngā taipitopito pukapuka
Press, Volume C, Issue 29503, 3 May 1961, Page 22
Word count
Tapeke kupu
128HIGHWAY TO TUNNEL Press, Volume C, Issue 29503, 3 May 1961, Page 22
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
Ngā mihi
This newspaper was digitised in partnership with Christchurch City Libraries.