CHEST HOSPITAL AT TIMARU
COMPLETION IN FEW DAYS , When finishing touches at the South Canterbury Hospital Board’s Chest J Hospital in Otipua road, Timaru, have < been completed in a few days, the < building will be ready for occupation. ; The cost of the new structure was about £7500, the architects being i Messrs Turnbull and Rule, and the builders were the No. 1 Group, Timaru Builders. The block, which has been built on , the west aide of Talbot Hospital, is 140 ft long by 31ft wide, and is one : storey high. The front faces north and contains 16 individual cubicles with a sun yiranda along the whole front. Behind the cubicles is a long corridor with all the service rooms on the south side. The equipment is of the most modern and up-to-date type, with stainless steel benches, and all the necessary sterilising appliances. v
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/CHP19430604.2.76
Bibliographic details
Ngā taipitopito pukapuka
Press, Volume LXXIX, Issue 23965, 4 June 1943, Page 9
Word count
Tapeke kupu
144CHEST HOSPITAL AT TIMARU Press, Volume LXXIX, Issue 23965, 4 June 1943, Page 9
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
Ngā mihi
This newspaper was digitised in partnership with Christchurch City Libraries.