MAIN SOUTH ROAD PAYING
+ TEMPORARY DEVIATION While the permanent paving is being laid on the Main South highwaybet ween Ashburton and Hinds the road will be deviated to facilitate the Work. The detour crosses the railway line at Tinwald and leads to a road on the west side of the railway, continuing on this road until it recrosses the railway line at Lymford road, about six miles south of Tinwald. Signboards are being erected to guide motorists to the detours. In announcing these arrangements, the District Public Works Engineer fair F. Langbein) said that it would of bo'h motorists ana the contractor if full use was made of the detour provided.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/CHP19350227.2.167
Bibliographic details
Ngā taipitopito pukapuka
Press, Volume LXXI, Issue 21409, 27 February 1935, Page 18
Word count
Tapeke kupu
111MAIN SOUTH ROAD PAYING Press, Volume LXXI, Issue 21409, 27 February 1935, Page 18
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
Ngā mihi
This newspaper was digitised in partnership with Christchurch City Libraries.
Log in