NEW DRY DOCK.
FILE DRIVING STARTED. SYDNEY, Sept. 10. Pile <1 riving for tlie construction of the new battleship graving dock between l'otts Point and Garden Island lias begun. A new road along the harbour foreshore from Woolloomooloo tip to Billyard Avenue, Potts Point, is to be made part of the roadway of the dock. This road has been planned by the Sydney City Council for some years to provide a new arterial traffic outlet through the congested Potts Point area to the eastern suburbs. The City Council has been asked to construct new roadways leading to the dock.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/AS19400921.2.83
Bibliographic details
Ngā taipitopito pukapuka
Auckland Star, Volume LXXI, Issue 225, 21 September 1940, Page 10
Word count
Tapeke kupu
99NEW DRY DOCK. Auckland Star, Volume LXXI, Issue 225, 21 September 1940, Page 10
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
Ngā mihi
This newspaper was digitised in partnership with Auckland Libraries.