H—47

This indicated that the fusing current had been in excess of 2,000 amps with a timedelay less than five seconds and that the preheating current did not exceed 30 per cent, of minimum fusing current of 325 amps —that is, 100 amps. From information received from Municipal Electricity Department the maximum load current for two-monthly period prior to the fire was 173, 171, and 173 amps per phase. As the fire occurred at approximately 3.30 p.m. on a hot, sunny afternoon in the middle of November it can safely be assumed that the lighting and heating load would be low and that the load per phase would be in the vicinity of 100 amps. This means that if there was any fault current it would be of a very low value.

Fig. II. —Length of Interstrand Weld Against Pre-heating Current for 22/.029 Fuse Link with Blowing Current of 1,800 Amps.

101

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert