Patetonga District. The metalling of a seven-mile section of the Patetonga Main Road, commenced in May, 1929, was continued during the summer months, and at the end of the year the base-course metal had been laid throughout and top course for a distance of 6 miles. The work carried out on the main road during the year comprised 51 chains of hill-road reconstruction, the spreading of 4,710 cubic yards of metal, and the cartage of 1,285 cubic yards of clay for haunching metal oil the peat section of the road. The base-course metal was laid for a distance of 100 chains on the Patetonga Landing Road 1,095 cubic yards of metal being used, and 590 cubic yards of clay carted by tramway for haunching the metal. The metal for these roads is obtained from a quarry opened up by the Department on Hauraki Plains County Council property. The quarrying, crushing, and delivering of the metal is carried out by contract. Drain-maintenance work carried out in this district comprised 37 miles 51 chains of drain-cleaning, and the excavation of 1,492 cubic yards for the widening and deepening of 61 chains of drain. The metalling of the main road has affected the river traffic, and cargo for Patetonga is now discharged at Ngatea or Kaihere Wharves, and all cream is now conveyed by road, instead of by launch as formerly. In consequence of these changes the tramway service for the delivery of goods from Patetonga Wharf to the township, which had been operated by the Department for thirteen years, was discontinued in June. 142 cubic yards of gravel was obtained from the Mangawhero Road drain and used on that road, and the important work of maintaining the roads during reconstruction and after metalling has not been neglected. Structural Work. Particulars of the flood-gates, culverts, and bridges completed during the year are contained in the summary. Extensive alterations and repairs were carried out to the Kaihere Wharf. The wharfshed was placed on shore on grid foundation, new approach to wharf constructed, and six piles in the original wharf renewed. Three large temporary dams were built of timber and steel-sheet piling to float dredges in canals under construction. All repairs to dredges and other plant were carried out on the works or at the Kerepeehi workshops. Engineering and Land Surveys. In addition to engineering survey work, land-subdivisional surveys of 2,030 acres were carried out, 41 miles of theodolite traverse were completed, 36 miles of levelling for road and drainage works, and 153 cross-sections of the river-channel were taken. Investigations and reports of several small schemes have been made. Rainfall records have been kept up to date, also river stage records. No stream-flow gaugings have been carried out, as practically normal river conditions prevailed throughout the year. Summary. The total length of the subsidiary drains constructed on the Hauraki Plains to date since the inception of the works is 731 miles 26 chains. Particulars of the works carried out during the year under review are summarized in the following schedule : — Length. Excavation. Miles ch. Cub. yd. Drains cleaned by manual labour .. .. .. .. .. 93 61 Drains widened and deepened by manual labour .. .. 26 29 60,176 Drains —New construction by manual labour .. .. .. 21 64 60,520 Stop-bank constructed by manual labour .. .. .. 0 52 2,300 Total quantity of drainage excavation by manual labour .. 122,996 New canals constructed by machines .. .. .. 0 77 28,394 River and canal improvement, machine construction .. .. 12 34 479,969 Reconditioning drains by machines .. .. .. .. .. 575 28,329 Total excavation by machines .. .. .. .. 536 692 Stop-banks constructed or partially constructed in conjunction with riverimprovements and canal-construction .. .. .. 10 74 Miles ch. Cub. yd. Roads metalled .. .. .. .. .. .. 2 13 3,981 Roads metalled, base course only .. .. .. . . 1 20 1,095 Roads metalled, top course only .. .. .. .. 7 21 7,353 Total quantity of road-metal laid .. .. .. .. 12,429 New roads formed, Hauraki Plains .. . . . . . . 2 21 Roads reconstructed and improved .. .. .. .. ..178 Clay carted for ballasting roads on peat subgrade and haunching metal 3 68 9,598 Fences erected .. .. .. .. .. .. 2 41

6

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert