23

D.--2A

Cost of Maintenance of Way, Works, and Buildings. As will be seen from the following statement, the milage of lines open for traffic increased by 3-32 per cent, during the period 1915 to 1925, while the maintenance of way, works, and buildings showed an increase of 54-80 per cent., and the cost per mile 49-60 per cent.

It must, of course, be borne in mind that costs —both in respect of wages and material —have advanced very considerably since 1915. The standard of maintenance on the New Zealand railways is a high one, and the only criticism that could be applied is that on certain of the branch lines it is unusually high. In his evidence the Chief Engineer stated that he was hoping to decrease his maintenance expenditure, at the same time keeping the line in as good a condition as it is to-day. Life of Rails.-- Except on steep grades carrying heavy traffic, the Department anticipate a life of from twenty-five to thirty years in respect of their rails. Construction of New Lines. The Chief Engineer, while carrying out deviations and yard improvements, does not construct new lines, this being in the hands of the Public Works Department. Having regard to the fact that that Department has the plant, equipment, and organization, and that the work is carried out on mainly contract lines under piecework, practically no day labour being used, it would be inadvisable to make any alteration in the existing (arrangements. The Chief Engineer has not until recently been consulted with regard to alignment, and is, therefore, in no way responsible for curves or gradients, or for the cost in deviation to ease grades, which is going on at present. Expenditure Estimates. At the commencement of the financial year the Chief Engineer forwards to the General Manager an estimate of the sum required during the ensuing year for the maintenance of track, structures, &c., and, when the estimates are passed by Parliament, an amount is allocated by the Chief Engineer to each district. In his evidence the Chief Engineer said he was not held up by the delay in the passing by Parliament of these estimates. Permanent-way Workshops. There are Maintenance workshops at the following centres : Penrose (Auckland District), East Town (Wanganui District), Ivaiwarra (Wellington District), Addington (Christchurch District), Dunedin, Invercargill, and Greymouth. The work done at these shops is as follows : — Carpenters' Work. —Joinery-work, fittings, furniture, &c., for buildings of all kinds ; structural timber-work, such as water vats and stands, windmills, stockyards, name-boards, notice-boards, &c. ; making and repairing trollies, and velocipedes ; making bridge spans, trusses, trestle piers, &c.

m , ,, , , , ,, , Total Miles of Line Maintenance of Way, i Cost per Mile Twelve Months ended 31st March, open for Traffic. Works, and Buildings. | open. £ £ 1915 .. .. .. .. 2,955 738,550 250 1916 .. .. .. .. 2,970 740,349 249 1917 .. .. .. .. 2,970 720,840 243 1918 .. .. .. .. 2,993 710,655 237 1919 .. .. .. .. 2,993 752,558 251 1920 .. .. .. .. 3,006 837,910 279 1921 .. .. .. .. 3,018 1,053,049 349 1922 .. .. .. .. 3,030 1,111,883 367 1923 .. .. .. .. 3,037 1,040,892 343 1924 .. .. .. .. 3,053 1,143,282 374 Increase 1924- over 1915 .. .. 3-32 per cent. 54-80 per cent. 49-60 per cent.

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert