Page image
Page image

D.—4a

98

Alternative Scheme (1). Passenger and local-goods traffic at present station-site. Sorting-yard (land, earthworks, and tracks) north of present station-site (say, about 92 m.). Small sorting-yard (interchange sidings) on Napier line, with tracks to main sorting-yard. Engine-depot, say, south of present station-site, with special track thereto. Double track, Longburn to Palmerston North : these tracks to be placed in centre of road and railway reserve. Extra track, Palmerston North to main sorting-yard, and regraeiing of present track (present gradient 1 in 63). Retain present level crossings. Main Street widened (on railway land), and shunting over Square and West Street. Estimate. £ Passenger and local-gooels station . . .. .. .. .. .. . . 100,000 Main sorting-yard .. .. .. .. .. .. :. .. 80,000 Subsidiary sorting-yard on Napier line, and tracks to main sorting-yard .. . . 20,000 Engine-depot, &c. .. .. '.. .. .. ' .. .. . . 50,000 Double track, Longburn to Palmerston North .. .. .. .. . . 50,000 Extra track, Palmerston to sorting-yard, and regrading of track .. .. .. 50,000 350,000 Contingencies .. .. .. .. .. .. .. .. .. 50,000 Total .. .. .'. .. .. .. £400,000 i Alternative Scheme (2). Station (low level) at present site to deal with all business except locomotive-depot. Bridge over centre of Square to allow of shunting to northern (eastern) side of Square. Purchase of property south of West Street to enable all present area to be utilized and for shunting facilities south end. West Street to be closed. This purchase to extend, to Kairanga Road. Main Street to be diverted to west (or north) side of railway as far as Kairanga Road. Cook Street to be bridged, and Pitt Street subway extended. Overbridges, with necessary approaches, at all crossings north of Square. Double track, Longburn to Palmerston North. This scheme woulel serve for a limited time only. Shunting, and passage of engines to and from engine-elepot, would be carried on over Kairanga Road level crossing. Estimate. £ Station-yard, buildings, <fee. .. .. .. .. .. .. .. 150,000 Engine-depot .. .. .. .. .. .. .. .. .. 50,000 Property . . . . .. . . . . . . .. .. .. 50,000 Diversion Main Street, roading, &o. .. .. .. .. .. .. 20,000 Double track, Longburn to Palmerston North, and separate tracks to engine-depot . . 50,000 Bridges — £ Cook Street.. .. .. .. .. .. .. .. 70,000 Extension Pitt Street subway . . .. .. • .. .. . . 35,000 Square to Terrace End (seven)* .. .. .. .. .. 350,000 455,000 775,000 Contingencies .. .. .. .. .. .. .. .. .. 50,000 825,000 If specially prepared surfaces for overbridges (concrete, tarred macadam, or other) add .. 30,000 Total .. .. .. .. .. .. £855,000 (Say, £850,000, compensation for closing south side of Square not included.)

* fee plan Ne>. 28970. Arrangement would not be considered satisfactory te) publio and owners of property in neighbourhood. Compensation would have to be paid to owners of property purchased, increasing cost by at leeist 50 per cent. See also plan No. 28969 for bridge at Sejuarc.

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert