5

C—B

Days worked. The mine during the year worked 231 days 5 hours, which is an increase of 10 days over the previous year's working. The average number of days worked per week was therefore 4-15. The number of men and boys employed in and about the mine throughout the year averaged 105. The miner's average daily earnings for the year works out to 17s. Bd. per shift, an increase of Bd. per shift over the previous year. There were a few minor accidents during the year, but not any of a serious nature. Plant. The plant and machinery in and about the mine has been maintained in good condition, and during the year seventy mine-tubs were made at the colliery workshop. Also a large stable was built near the entrance to the mine, thus enabling the horses to be brought out of the mine daily. Underground Development. Operations underground have been carried out much on similar lines to thai "I the previous year— viz., developing the West workings, and extraction of pillars in the Cave section. In the West section, where ten pans of miners are employed, coal of excellent quality was produced during the first nine months of the year, but recent development has however proved the north-west portion of the area to be considerably faulted, and the prospects of extending our present workings do not appear very promising. In the Cave section, where pillars are being extracted. I here is in places from I ft. to 5 ft. of soft coal overlying the main seam. This coal, not being marketable, is left in the old workings and becomes buried by falls of roof, consequently heating has commenced which necessitated a line of stoppings being built to seal off the heated workings. The main-dip workings of the same section, where a large area of soft coal was opened up during the labour troubles in the coal-mining industry in New South Wales, has during the year caused much trouble and expense through spontaneous combustion, and although every precaution was taken in sealing oil' this portion, the first line id' stoppings was found inadequate and an additional line had to be built. Fortunately in sealing off these heated portions the coal lost is not marketable, and would not have been worked had heating not commenced. Exploration. Work under this head has been confined to boring by means of the diamond drill on the Charming Creek area. During the year a considerable amount of boring has been done in a systematic maimer on a north-easterly line from the central part of the Held where the 20 ft. seam of coal was first proved by boring to exist. Along this line bores Nos. S. 10. 11. 12. L 3, and II were put down, the distance between each being approximately 20 chains. In addition two flank-holes. \os. !t ami l(i. were put down on the western side id' the line, also No. 15 put down 20 chains south from the central part of the field. The two Hank-holes and one to the. south failing to find coal, also all bores beyond No. 10 failed to find coal id' a workable thickness. It appears the area of workable coal is somewhat limited, having a width only id' about 10 chains from east to west, and the same in extent northwards. This completes boring operations on the Charming Creek ana. and a schedule of all bores put down has been forwarded to the Department. In conclusion, permit me to say that all the officers have performed their duties in a satisfactory manner, and 1 am indebted to the Inspecting Engineer for valuable assistance rendered in connection with the working of the mine and prospecting the new coalfield. I have, &c, I. A. James, Manager.

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert