35
H.—6
Return of Defects found on the Inspection of Boilers and Fittings in the Otago District during the financial Year ended the 31st March, 1884.
Description. Dangerous. (Ordinary. Total. 1883 : May 8.—One multitubular boiler, loco make ; formerly used at the Green Island colliery for pumping and winding. Condemned May 8.—Vertical field tubes : Slightly cracked in uptake and several rust holes ; and field-tubes gone May 15. —Circular longitudinal tubular : Very dirty inside, endangering the shell (two stays to go in between crown of dome and shell) and seam leaking on crown May 16.—Vertical field-tubes, field boiler: Ends of tubes burned off through sediment settling May 25.— Portable : Compensation-ring to go round man-hole. Waste through leakage June 15.— Vertical hoist: Uptake entirely gone. New uptake. Corrosion June 25.— Cornish: Wasting inside. Corrosion July 19. —Vertical: Slight laminated scale on uptake July 30.—Vertical: Slight waste internally. Corrosion ... August 4.—Eeturn tubular : Laminated plate in crown of furnace ... August 10. —Steam digester: Angle-irons and crown considerably wasted through corrosion August 27.—Portable : Shell internally corroded. Will soon require to be replaced August 28. —Vertical: Fittings of pressure-gauge useless .. September 6. —Cornish : Plate wasted at blow-off. Corrosion September 24.—Cornish : Plates corroded a good deal where in contact with brickwork October 4.—Saw-mill tramway locomotive : Crown of firebox cracked through shortness of water. New crown October 9. —Portable : Through-stays wasted, and plate round manhole wasted October 16.—Egg end: Fittings of water-gauge bad. New one ... October 16.—Drying cylinders : Safety-valve to be put on steam-pipe of drying cylinders November 5. —Lancashire: Several rivets corroded in No. 2 flue. To be renewed November 9.—Fittings: Two stays to be put on steampipe to support stuffing-box November 23. —Circular longitudinal-tubular : Fittings of pressuregauge done 1884: January 7.—Steam digester: Laminated plate on top, and angle-irons, considerably corroded January 7. —Steam digester: Laminated plate on top, and angleirons, considerably corroded January 12. —Vertical: Uptake corroded nearly through. Is now - sheathed February 5.— Vertical: Man-hole door done through corrosion. New door February 12.—Cornish : Circular seam in tube sprung through overheating, and longitudinal seam partly depressed March 10. —Longitudinal tubular : Tubes all gone through corrosion March 10.—Longitudinal tubular : Tubes all gone through corrosion March 10. —Cornish tubular : Tubes sprung through dirt March 19.—Portable: Tubes sprung through tear and wear March 28.—Portable : Considerably worn through tear and wear ... 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Totals ... 29 81
Use your Papers Past website account to correct newspaper text.
By creating and using this account you agree to our terms of use.
Your session has expired.