1898. NEW ZEALAND.

HURUNUI-BLUFF RAILWAY: EXTENSION TO BLENHEIM (ESTIMATE OF COST OF).

Return to an Order of the House of Representatives dated the 15th July, 1898. Ordered, " That there be laid before this House,—(l.) Any data the Government has in its possession as to the estimated oost of extending the Hurunui-Bluff line from Culverden to Blenheim, and the mileage to be constructed as by the route originally contemplated. (2.) Any similar data as to the cost and mileage of such extension if takon by way of Cheviot." —(Hon. Major Stewabd.)

Memoeandum by Mr. P. S. Hay, M.A., M.lnst.C.E., Superintending Engineer, Public Works Department, re Completion of Bailway, Culverden to Blenheim. The originally contemplated route, Culverden to Blenheim, seems to have been the Green Hills route, via Waiau Township, Green Hills, Kaikoura, and the coast. No estimate of the cost of a line by this route appears to have been made, but Mr. W. N. Blair, in his report of 1879, says the cost would be about the same as the Cheviot Hills route. The total distance from Picton to Christchurch by this route is given as 212 miles, and the length now to be made is 122 miles. On eight miles of this length the formation has been done. The extension of the line from Culverden to Blenheim, considered by the Boyal Commission of 1883 —Middle Island Bailway Extension —was the central route, via Waiau Township, Hossack Pass, Acheron, Clarence, and Wairau Biver Valleys. Two estimates of cost are given : one founded on Mr. J. G. Blackett's report is £1,400,000; the other, on Mr. C. Y. O'Connor's report, is £1,290,000 for the length of 175 miles then requiring to be constructed from Waikari to Blenheim. There are now 156 miles to be constructed by this route, from Culverden to Blenheim, and the cost would be, say, £1,240,000 or £1,130,000. The total distance, Picton to Christchurch, by this route is given at 243 to 245 miles. The distance, Picton to Christchurch, by the coast or Cheviot Hills route was taken at 205 miles by the 1883 Boyal Commission, but the figures are greater on some other papers. The length now to be constructed from Waipara to Blenheim would be about 144 miles, on eight miles of which the formation is completed. At the mileage rate of Mr. W. N. Blair's report of 1879 the cost to complete would be about £1,100,000 ; but the Boyal Commission apparently took Mr. C. Y. O'Connor's estimate, which is £150,000 higher than Mr. Blair's. The estimate to complete the line by this route may therefore be taken either as £1,100,000 or £1,250,000. The following sections have been surveyed on the Cheviot Hills route: Blenheim to Starborough, 15 miles 48 chains; estimated cost, £111,000. Kahautara to Waiau Biver, 26 miles 57 chains; estimated cost, £449,900. Waiau Biver to Greta, 22 miles ; estimated cost, £101,150. A list of printed papers and reports dealing with the various routes is attached. Public Works Office, Wellington, 9th August, 1898. P. S. Hay.

Tabular Summary.

* Eight miles of formation finished.

List of Papees, Bepoets, Etc. Parliamentary Papers: E.-4, 1875; E.-l, 1876, pages 35 to 42; E.-8, 1878; E.-Ba, 1878; E.-l, 1879, pages 60 to 71; D.-l, 1882, pages 61 to 63; D.-2, 1883, Beport, Boyal Commission Middle Island Bailway Extension. Evidence of Engineers examined by Boyal Commission, D.-2, 1883 : J. G. Blackett, page 44 ;. E. Dobson, pages 1, 2, and 3; H. B. Huddleston, pages 7 and 8 ; C. Y. O'Connor, page 18; J. C. Bichmond, page 41, and Appendices (pages 59 to 66); John Bochfort, pages 44, 47, and 51; C. V.. O'Connor, Beport to Boyal Commission, with tables, pages 69 to 88. Approximate Cost of Paper.—Preparation, not given ; printing (1,325 copies), 18s. 6d.

By Authority: John Mackay, Government Printer, Wellington.—lB9B.

Price 3d.}

Route. Length, Picton to Christchurch. 212 miles 245 miles 205 miles Length now to make. Estimated to complete. ... 122 miles* ... 156 miles ... £1,240,000 or £1,130,000 ... 144 miles* ... £1,100,000 or £1,250,000 i-reen Hills Jentral Iheviot

This report text was automatically generated and may include errors. View the full page to see report in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/parliamentary/AJHR1898-I.2.2.2.9

Bibliographic details

HURUNUI-BLUFF RAILWAY: EXTENSION TO BLENHEIM (ESTIMATE OF COST OF)., Appendix to the Journals of the House of Representatives, 1898 Session I, D-08

Word Count
667

HURUNUI-BLUFF RAILWAY: EXTENSION TO BLENHEIM (ESTIMATE OF COST OF). Appendix to the Journals of the House of Representatives, 1898 Session I, D-08

HURUNUI-BLUFF RAILWAY: EXTENSION TO BLENHEIM (ESTIMATE OF COST OF). Appendix to the Journals of the House of Representatives, 1898 Session I, D-08

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert