GOLD MINING
COMPANY RETURNS. The Argo Gold Dredging Company, Ltd._, reports that for the period ended May 5 73 ounces of gold was obtained for 322 hours' work, 18.000 yards being treated. The Gillespie’s Beach Gold Dredging Co.. Ltd., reports a washup of 360 z., the result of 127 hours’ work, during which 12,500 yards were treated. The Snowy River Dredge returned 164 ounces for 127 hours from 23,600 yards. Moonlight Goldfields report a washup on May 21 totalling 40oz. for 265 hours.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/WAITA19420527.2.83
Bibliographic details
Ngā taipitopito pukapuka
Wairarapa Times-Age, 27 May 1942, Page 6
Word count
Tapeke kupu
83GOLD MINING Wairarapa Times-Age, 27 May 1942, Page 6
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Wairarapa Times-Age. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.