GOLD MINING
COMPANY RETURNS. Mossy Creek return last week was GOoz gold from 7441 yards in 130 hours. Rimu Flat, 1560 z from 24,605 yards in 134 hours. Gold Mining Co'., Ltd., reports s»>r the year ended March 31 that workfiwas carried on with the usual stoppages for adjustment, but, because of-the exceptionally severe winter, approximately three months’ working time was lost. Two paddocks, totalling about three-quarters of an acre and measuring 101,000 cubic yards, were worked, and a third was started. ’The gold won was 16240 z valued at £12,982. The profit after installing a new tailings conveyor at a cost of £l2OO, was £1595.
The Gillespie’s Beach dredge reports for the week ended June 29 a wash-up of 370 z from 16,397 cubic yards worked in 127 hours.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/WAITA19400702.2.106.2
Bibliographic details
Ngā taipitopito pukapuka
Wairarapa Times-Age, 2 July 1940, Page 9
Word count
Tapeke kupu
130GOLD MINING Wairarapa Times-Age, 2 July 1940, Page 9
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Wairarapa Times-Age. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.