GREAT CANAL
WORK OF FIFTY YEARS IN GERMANY NETWORK OF WATERWAYS LINKED. EXPENDITURE OF £50.000,000. By Telegraph—Press Association—Copyright. • BERLIN. October 31. Herr Rudolf Hess, deputising for Herr Hitler, opened the Midland canal, which cost £50,000,000. It is 300 miles long and is equipped with a great ship hoist, enabling vessels to leavq Magdeburg for Berlin or Silesia or the mouth of the Rhine. Its construction took fifty years. It joins a network of waterways extending 7900 miles from east to westward. The completion of the Rhine and the main Danube canal in 1943 will unite the system with the Black Sea. The Elbe already joins the Midland canal. Czechoslovakia traffic is . expected to be 25,000,000 metric tons yearly.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/WAITA19381101.2.45
Bibliographic details
Ngā taipitopito pukapuka
Wairarapa Times-Age, 1 November 1938, Page 5
Word count
Tapeke kupu
118GREAT CANAL Wairarapa Times-Age, 1 November 1938, Page 5
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Wairarapa Times-Age. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.