THAMES TUNNEL
PILOT BORING COMPLETED. (By Telegraph—Press Association.) RUGBY, October 5. The pilot boring of the Dartford to Purfleet tunnel under the Thames, which will join the counties of Essex and Kent, was completed yesterday, when the last five feet of the curtain of chalk was broken. There was an error of only of an inch in the line and three-sixteenths of an inch in the level of the tunnel when the two borings from the Essex and Kent sides met. The total length of the pilot tunnel, is 2383 feet.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/WAITA19381007.2.49
Bibliographic details
Ngā taipitopito pukapuka
Wairarapa Times-Age, 7 October 1938, Page 5
Word count
Tapeke kupu
91THAMES TUNNEL Wairarapa Times-Age, 7 October 1938, Page 5
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Wairarapa Times-Age. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.