FLOOD PROTECTION
GOOD PROGRESS WITH WAIPOUA SCHEME.
Splendid progress is being made with work on the Waipoua River Hood protection scheme. Including drivers, there are at present about 61 men engaged in cleaning the river-bed under the Columba Road bridge and further down stream. When this is completed the men will transfer operations to the vicinity of the Park Lake. A start will be made by the contractors next week with the extension of the Columba Road bridge, two forty-foot spans being added.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/WAITA19380405.2.59
Bibliographic details
Ngā taipitopito pukapuka
Wairarapa Times-Age, 5 April 1938, Page 7
Word count
Tapeke kupu
83FLOOD PROTECTION Wairarapa Times-Age, 5 April 1938, Page 7
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Wairarapa Times-Age. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.