SURVEY OF MAIN TRUNK RAILWAY,
(by telegraph.—own correspondent). Wellington, Last Night. Mr LoUCII, who has been the superintending engineer in charge of the works between Eketahuna and Woodville, will iu a few days take in hand the survey from the Auckland md of the North Island Main Trunk Railway, Mr Holmes and his staff working from the southern end. It is expected that the survey will be completed within twelve months.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/WAIGUS18980301.2.20
Bibliographic details
Waikato Argus, Volume IV, Issue 253, 1 March 1898, Page 2
Word Count
71SURVEY OF MAIN TRUNK RAILWAY, Waikato Argus, Volume IV, Issue 253, 1 March 1898, Page 2
Using This Item
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.