NEW SYLVIA.
The mine manager (Mr El A. Daldy) reports on the mine and works 1 I for" tha ■ past week as follows: New low lielv'el: Tha dontracttors havle adVaaicield tha face , 9ft;, mlafcing total length of level 6's6ft, -witli country a shadta easier to work and water making in flotor and fade. At tlio battery the frtaniet work of engine ho\ise is up and concrieitie work on floors a.ud blocks completed. The hopper lias "been connected with battery 'by trestlew'ork and 1 truck line, and finishing' detail work is going on inside the ibJuildiing. Assay building and fittings aila ciomplete and stores for same o^a hand."
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/THS19110501.2.24.2
Bibliographic details
Ngā taipitopito pukapuka
Thames Star, Volume XLVII, Issue 10354, 1 May 1911, Page 2
Word count
Tapeke kupu
107NEW SYLVIA. Thames Star, Volume XLVII, Issue 10354, 1 May 1911, Page 2
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Thames Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.