CALEDONIAN.
Mr Stone, the contractor for the erection of the new poppets has got the legs in position, and will be finished in a few days. He is making a very substantial job. The only work at present in progress in the mine is the sinking of a winze to connect the No. 2 and 3 levels, this being a continuation of the winze connecting tin Nos. 1 and 2 levels. Besides assisting in the op*;iing of the mine this new work will greatly improve the ventilation.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/THS18800527.2.17.1
Bibliographic details
Ngā taipitopito pukapuka
Thames Star, Volume XI, Issue 3562, 27 May 1880, Page 2
Word count
Tapeke kupu
87CALEDONIAN. Thames Star, Volume XI, Issue 3562, 27 May 1880, Page 2
Using this item
Te whakamahi i tēnei tūemi
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.