MOANATAIRI.
Yesterday the manager made a start at sinking the main.shaft for a new level. In (he tunnel level the reef is about three ',feet thick', and a trial lot of 20 tons has 'been put through for a poor yield of amalgam. The lode is now running about parallel with the course of the tunnel. .All speed is being made with the, rise from 80 feet level to connect winze from tunnel )erel.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/THS18780917.2.14.1
Bibliographic details
Ngā taipitopito pukapuka
Thames Star, Volume VIII, Issue 2992, 17 September 1878, Page 2
Word count
Tapeke kupu
74MOANATAIRI. Thames Star, Volume VIII, Issue 2992, 17 September 1878, Page 2
Using this item
Te whakamahi i tēnei tūemi
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.