PETROLEUM.
MOTUROA ACTIVITIES.
Concrete foundations are being put fa for the Taranaki (New Zealand) OH Wells, Limited's derrick, wthioh will b<j. erected on Mr. Honeyfleld's property at Moturoa, just on the town side of No. I derrick. If the machinery arrives on the date (the 20th instant) it is drilling should commence by November The earthwork in connection with tb* erection of the refinery buildings on thft* Prison Reserve is 'nearly completed, and a start will very shortly be made with. the concrete foundations. The initial shipment of the refinery plant should, arrive at New Plymouthabout the 20th instant. Drilling has been commenced at the two derricks on the Company's Bell Block property. The Taranaki Oil Options, Limited,. was registered as a private company on August 28 with a capital of £IOO, divided' into 100 shares of £1 each. The subewipers are:—New Plymouth: Eustatius Griffiths, 50; Herbert Winnal Whitcombe, 50, and the objects are to acquire interest in land containing oil and material*and test and work same.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/TDN19121007.2.22
Bibliographic details
Ngā taipitopito pukapuka
Taranaki Daily News, Volume LV, Issue 119, 7 October 1912, Page 4
Word count
Tapeke kupu
167PETROLEUM. Taranaki Daily News, Volume LV, Issue 119, 7 October 1912, Page 4
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Taranaki Daily News. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.