MINING.
TELLURIDES COMPANY. Following is the mine manager's report for the week ending 20th January, 1912:—. Gordon—The main low level crosscut in this section has been advanced l 14 | feet for the week and continues to pass through a very favorable class of country. The level on the south trend of the George lode has been advanced 8, feet during the week, and the dimensions and character of the reef remain about the same as last reported. Volunteer.—Driving has been continued east and west of the main crosscut, four feet having been driven east and 13 feet west, but as there is no sign! of quartz in either direction, work has I been discontinued here and the main| crosscut will be extended further. j
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/TDN19120125.2.68
Bibliographic details
Ngā taipitopito pukapuka
Taranaki Daily News, Volume LIV, Issue 177, 25 January 1912, Page 8
Word count
Tapeke kupu
124MINING. Taranaki Daily News, Volume LIV, Issue 177, 25 January 1912, Page 8
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Taranaki Daily News. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.