MINING
TELLURIDES PROPRIETARY, LTD. Following is the mine manager's report for the fortnight ending August 12:— Gordon.—The main low level crosscut in this action has been advanced 34 feet for the fortnight through a splendid class of country, highly charged with interlaced veins of quartz. On Thursday, 10th inst., the development of the new lode was commenced, going north from the cross-cut. This lode will in future be known as the "George," and is at present six feet in thickness and showing telluride ore. Volunteer—Driving operations in this section have been at a standstill since the 2nd of the month, owing to our hawing to timber the drive, but this will be completed in the course of a day or two, and driving will be then resumed.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/TDN19110818.2.70
Bibliographic details
Ngā taipitopito pukapuka
Taranaki Daily News, Volume LIV, Issue 48, 18 August 1911, Page 8
Word count
Tapeke kupu
127MINING Taranaki Daily News, Volume LIV, Issue 48, 18 August 1911, Page 8
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Taranaki Daily News. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.