MINING.
TELLURIDES PROPRIETARY, LTD. The mine manager of the Tellurides proprietary, Ltd., reports for the week ended June 10th that very good prpgress has been made with the extension of the GoTdon level, 22ft. of driving having been accomplished with two shifts for the week. The low level on the Volunteer section has been extended sft. for the week with one shift. He also reports that the machinery k working smoothly and giving every satisfaction.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/TDN19110617.2.53
Bibliographic details
Ngā taipitopito pukapuka
Taranaki Daily News, Volume LIII, Issue 330, 17 June 1911, Page 6
Word count
Tapeke kupu
75MINING. Taranaki Daily News, Volume LIII, Issue 330, 17 June 1911, Page 6
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Taranaki Daily News. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.