PETROLEUM NEWS.
TARANAJQ PETROLEUM COMPANY'S WEEKLY REPORT. i N °' 1 !T : Ver y •Me work has been dona at this bore owing to Mr Simmon harang lieen so fully engaged jilt the tlier bores, and especially at No. 4. > -Kio pump and wire rope in No « were received on Monday and borinj again resumed, and the bore is practically dry, only a little water coming in at the bottom. No. 3 is now cased to 2271 feet, and the total depth is 2276 feet. It is heir, pumped out now (as there has ». slight leakage from below), and as another hard streak has been struck it is hoped that the water will be effectually shut off.
No. 4: The lias been put In m endeavoring to recover the 0-inch casing, and it is now hoped that the casing has been caught hold of again. It was decided th'i/t the ordinary annual meeting be held at II a.iii. on Thursday, the 31st October, inn?
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/TDN19070803.2.7
Bibliographic details
Ngā taipitopito pukapuka
Taranaki Daily News, Volume L, Issue 60, 3 August 1907, Page 2
Word count
Tapeke kupu
163PETROLEUM NEWS. Taranaki Daily News, Volume L, Issue 60, 3 August 1907, Page 2
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Taranaki Daily News. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.