GOLD DREDGING.
PiiK MESS AS* OIATION. Gekymouth, March 11. The Wai)iUM dredge washed up Iloz lldwt 12grs. for 133 hours' work; tbe Buller Junction, 250z for 120 hoars; the Lwiatlwn, 12m for 120 hours; and thy Buller dredge, 12oz for 135 hours. Tbe Giv.y River dredga did not wash up. Theie is no return fratn tbe Dobaou or the Nelson Creek. The 'Now River dredg : is getting a little gold. Dcsedin, March 11. Duriog the week ended to-day, reports have bean received from 47 dredges, the total yield bung 15630z. or an average of 330z per dredge. Additional returns are : Second Magnetic, 350z; Central Electric, 330z 17dwt; Upper Ohutto Creek, 25 z 18dwt; Golden Gate, 240z 17dwfe; EvmVFiat, 12oz.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/TDN19010313.2.13
Bibliographic details
Ngā taipitopito pukapuka
Taranaki Daily News, Volume XXXXIII, Issue 49, 13 March 1901, Page 2
Word count
Tapeke kupu
119GOLD DREDGING. Taranaki Daily News, Volume XXXXIII, Issue 49, 13 March 1901, Page 2
Using this item
Te whakamahi i tēnei tūemi
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.