NEW BRIDGE AT HAMILTON.
Two and a half years’ work will be brought to a conclusion on Monday •Adtih the opening of the Fairfield Bridge, -spanning the Waikato River, to the north of Hamilton, by. the Minister of Public Works, Hon. R. Semple. The bridge is a concrete structure of imposing bowstring de< sign.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/TCP19370423.2.27
Bibliographic details
Ngā taipitopito pukapuka
Taranaki Central Press, Volume IV, Issue 415, 23 April 1937, Page 5
Word count
Tapeke kupu
54NEW BRIDGE AT HAMILTON. Taranaki Central Press, Volume IV, Issue 415, 23 April 1937, Page 5
Using this item
Te whakamahi i tēnei tūemi
Copyright undetermined – untraced rights owner. For advice on reproduction of material from this newspaper, please refer to the Copyright guide.