WATER RETICULATION.
New Mains Being Laid In Borough Streets.
The work of improving the town water supply is at present being continued and only a small section remains to be done to complete the reticulation scheme decided upon.
The re-laying of a main in Juliet street, between Pembroke road and Regan street, was completed yester. day. The three-inch pipes were taken out and replaced by the four-inch size. This morning ’Borough workmen were employed in Miranda street laying a new fourJinch tnain from
Regan street to Fenton street. A portion of Fenton street, between Miranda street and Broadway, ' will next be opened up and this will complete the year’s programme though if is possible that other small sections might bo done.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/TCP19370212.2.30
Bibliographic details
Ngā taipitopito pukapuka
Taranaki Central Press, Volume IV, Issue 358, 12 February 1937, Page 4
Word count
Tapeke kupu
121WATER RETICULATION. Taranaki Central Press, Volume IV, Issue 358, 12 February 1937, Page 4
Using this item
Te whakamahi i tēnei tūemi
Copyright undetermined – untraced rights owner. For advice on reproduction of material from this newspaper, please refer to the Copyright guide.