No Results From Turangi Commercial Site Allocation For Another Three Weeks
It was not anticipated that there would be any results of the applications for sites in the commercial area of Turangi for about three weeks, Mr A. W. Gibson, project engineer at the Tongariro power development told Turangi Liai- ; son Committee last night. He said the last application would be heard in Wellington and Wanganui shortly. "The response has been very encouraging," Mr Gibson said. "The commit- : tee hopes to see the whole commercial frontage filled I with very attractive buildings."
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/TAUTIM19650601.2.9
Bibliographic details
Taupo Times, Volume XIV, Issue 42, 1 June 1965, Page 1
Word Count
92No Results From Turangi Commercial Site Allocation For Another Three Weeks Taupo Times, Volume XIV, Issue 42, 1 June 1965, Page 1
Using This Item
Stuff Ltd is the copyright owner for the Taupo Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.