SITE OF ATIAMURI HYDRO DAM
Scoops and mechanical shovels are digging into and re-shaping the banks of the Waikato River at Atiamuri, forming the diversion cut and excavating for the foundations of the long earth wing for the main concrete dam. The photograph above is taken looking upstream toward the new Bailey bridge now carrying the highway (centre). The old bridge is over the ridge to left, the diversion cut to the right. The new highway will be about a quarter mile below the dam.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/TAUTIM19540917.2.4
Bibliographic details
Taupo Times, Volume III, Issue 138, 17 September 1954, Page 1
Word Count
85SITE OF ATIAMURI HYDRO DAM Taupo Times, Volume III, Issue 138, 17 September 1954, Page 1
Using This Item
Stuff Ltd is the copyright owner for the Taupo Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.