The headwaters of the Hinemaiaia Hydro Electricity Station. Upper left, a view of the new lake, showing the overflow along the spillway. The group of people consists of members of the Taupo Town Board, Engineer-in-Charge, and others. Upper right: The new waterfall cascading down to join up with the old stream in the canyon below.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/TAUTIM19530114.2.2.2
Bibliographic details
Taupo Times, Volume II, Issue 52, 14 January 1953, Page 1
Word Count
55The headwaters of the Hinemaiaia Hydro Electricity Station. Upper left, a view of the new lake, showing the overflow along the spillway. The group of people consists of members of the Taupo Town Board, Engineer-in-Charge, and others. Upper right: The new waterfall cascading down to join up with the old stream in the canyon below. Taupo Times, Volume II, Issue 52, 14 January 1953, Page 1
Using This Item
Stuff Ltd is the copyright owner for the Taupo Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.