TO BUILD LONG BRIDGE
MR. KANDYAN’S APPOINTMENT
A bridge 21 miles long and expected ™ . £2,000.000 is to be built across th® lower Zambesi River in East Africa lur. J-. vv. A. Mandman, who was emrineer in charge at the Arapuni hydroelectric works when the construction' was in the hands of Sir W. G. Armstrong- Wh , t ". orth j Ltd has been pointed designer and consulting engineer for this large undertaking years 6 to^hT' 1 Pr ° bably take “vcn
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19291219.2.121
Bibliographic details
Sun (Auckland), Volume III, Issue 850, 19 December 1929, Page 12
Word Count
78TO BUILD LONG BRIDGE Sun (Auckland), Volume III, Issue 850, 19 December 1929, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.