PROGRESS OF TRAM TRACKS TO POINT CHEVALIER.—The laying of tho tram tracks to Point Chevalier is progressing rapidly. The picture shows the almost completed tracks at the Surrey Crescent end.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19291017.2.178.2
Bibliographic details
Sun (Auckland), Volume III, Issue 796, 17 October 1929, Page 16
Word Count
30PROGRESS OF TRAM TRACKS TO POINT CHEVALIER.—The laying of tho tram tracks to Point Chevalier is progressing rapidly. The picture shows the almost completed tracks at the Surrey Crescent end. Sun (Auckland), Volume III, Issue 796, 17 October 1929, Page 16
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.