NEW HARBOUR DREDGE
OTAGO BOARD'S PURCHASE (Special to THE SUN) DUNEDIN, Today. It is expected that the Otago Harbour Board’s new dredge, Otakou, will arrive at Dunedin next month. The vessel, which was constructed by Messrs. Fleming and Ferguson, of Paisley, Scotland, will cost £124.876 delivered at Port Chalmers. The dredge works with hoppers. She is 256 ft in length with 48ft beam, and her loaded draught is 15ft 9in. Her full load capacity of 2,000 tons can be dredged into the vessel in two hours. When fully loaded her 1,450 horsepower oil-burning engines will drive her at 9 knots and 104 knots when in light trim. The dredge is splendidly finished and very powerful. She is fitted throughout with electric light and the crew’s quarters have every convenience.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19290927.2.47
Bibliographic details
Sun (Auckland), Volume III, Issue 779, 27 September 1929, Page 6
Word Count
129NEW HARBOUR DREDGE Sun (Auckland), Volume III, Issue 779, 27 September 1929, Page 6
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.