WORK ON THE INTERIOR OF AUCKLAND’S NEW RAILWAY STATION is progressing rapidly. Top (left): Looking down one of the subways. Tiling work in these is now almost finished. Right: Two of the massive columns which support the roof of the main entrance. Lower: A side view of one of the subways which will connect the various platforms.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19290904.2.193.1
Bibliographic details
Sun (Auckland), Volume III, Issue 759, 4 September 1929, Page 18
Word Count
57WORK ON THE INTERIOR OF AUCKLAND’S NEW RAILWAY STATION is progressing rapidly. Top (left): Looking down one of the subways. Tiling work in these is now almost finished. Right: Two of the massive columns which support the roof of the main entrance. Lower: A side view of one of the subways which will connect the various platforms. Sun (Auckland), Volume III, Issue 759, 4 September 1929, Page 18
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.