1921 - 1929
In 192 I a committee of experts finally decided in favour of Arapuni as source of supply and the contract for the construction of the dam and power house was let to Messrs. Armstrong, Whitworth and Coy., in 1924, for a price of £1,175,652. The dam was completed in November, 1927, the power house construction being taken over by the Public Works Department. The first turbine ran on May 4, and the first section of the Arapuni transmission line was tested with Horahora power on May 8. Everything is now in readiness for the transmission of power from Arapuni to Auckland.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/SUNAK19290601.2.134.55.2
Bibliographic details
Sun (Auckland), Volume III, Issue 678, 1 June 1929, Page 17 (Supplement)
Word Count
1031921 – 1929 Sun (Auckland), Volume III, Issue 678, 1 June 1929, Page 17 (Supplement)
Using This Item
Stuff Ltd is the copyright owner for the Sun (Auckland). You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.