Thank you for correcting the text in this article. Your corrections improve Papers Past searches for everyone. See the latest corrections.

This article contains searchable text which was automatically generated and may contain errors. Join the community and correct any errors you spot to help us improve Papers Past.

Article image
Article image
Article image
Article image

TAKAPUNA DRAINAGE

PIPELINE COMPLETED Mr. Sling er, the engineer of the Takapuna Borough Council, reported this morning to the Mayor of tin* borough. Mr. J. W. Williamson, th.ii the bolting up of the long sower outfall pipe-line had been successful!' completed at the end of the Milford storage culvert at Black Rock The pipe line, which is over 500 feet in length, had been assembled and tested on Takapuna Beach, and was floated round on Tuesday last with a favourable tide, and laid in position, and by intensive work since the desired end of the most necessary and important work reached finality earlv this morning. There are two outfalls in the system —one as above and the other at St. Leonard’s, and the work meets with the approval of the officials of the Health Department and the Harbour Board. •

Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/SUNAK19290418.2.131

Bibliographic details

Sun (Auckland), Volume III, Issue 641, 18 April 1929, Page 11

Word Count
139

TAKAPUNA DRAINAGE Sun (Auckland), Volume III, Issue 641, 18 April 1929, Page 11

TAKAPUNA DRAINAGE Sun (Auckland), Volume III, Issue 641, 18 April 1929, Page 11

Help

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert